News & Articles
Magnavales Engineering Team Switches to Electric
Following the announcement that our new store in Easton will be run 100% on renewables, we have now made the decision to change our engineering fleet to electric in order to be as sustainable as possible.
Our new electric engineering fleet will help us combat diesel emissions and, while only a small change will take us another small step towards our emissions targets.
Our aim is to reduce our carbon and nitrogen dioxide emissions and, in many other small ways, change and adapt our business to combat climate change and help reach the country’s goal of transitioning to a net zero energy system by 2050, in part, by phasing out diesel vans by 2030.
The engineering fleet is primarily used by our internal engineering team, allowing them to travel between our facilities located in Chesterfield, Scunthorpe, Warrington, and soon Easton.
If you’re interested in any of our services, or to find out more about what we could offer you, call 01246 854999 or visit www.magnavale.co.uk/contact/
More News & Articles
Magnavale Warrington Achieve BRC AA Grade Certification
News & ArticlesMagnavale Warrington Achieve BRC AA Grade Certification Recently, we very proudly announced that our Chesterfield site...
Sustainable Cold Storage
News & ArticlesSustainable Cold Storage As one of the UK’s leading providers of temperature-controlled storage, and a crucial part of...
Direct-to-Consumer Pick & Pack
News & Articles Contact UsHead Office:Magnavale Ltd, Park Road, Holmewood Industrial Park, Chesterfield,...
Contact Us
Head Office:
Magnavale Ltd, Park Road,
Holmewood Industrial Park,
Chesterfield, S42 5UY


