News & Articles
Magnavales Engineering Team Switches to Electric
Following the announcement that our new store in Easton will be run 100% on renewables, we have now made the decision to change our engineering fleet to electric in order to be as sustainable as possible.
Our new electric engineering fleet will help us combat diesel emissions and, while only a small change will take us another small step towards our emissions targets.
Our aim is to reduce our carbon and nitrogen dioxide emissions and, in many other small ways, change and adapt our business to combat climate change and help reach the country’s goal of transitioning to a net zero energy system by 2050, in part, by phasing out diesel vans by 2030.
The engineering fleet is primarily used by our internal engineering team, allowing them to travel between our facilities located in Chesterfield, Scunthorpe, Warrington, and soon Easton.
If you’re interested in any of our services, or to find out more about what we could offer you, call 01246 854999 or visit www.magnavale.co.uk/contact/
More News & Articles
Magnavale Scunthorpe Achieves BRCGS AA Grade Certification
News & ArticlesMagnavale Scunthorpe Achieves BRCGS AA Grade Certification Scunthorpe has joined our Chesterfield and Warrington sites...
How to Blast Freeze Down Food Products with Magnavale
With 30 years of experience within the industry, Magnavale have developed a reputation for being a temperature-controlled services partner...
Freezing Plant-Based Proteins
Late last year we announced that after extensive consultations with our partners, we decided to become the first cold store network in the...
Contact Us
Head Office:
Magnavale Ltd, Park Road,
Holmewood Industrial Park,
Chesterfield, S42 5UY


