News & Articles
Magnavales Engineering Team Switches to Electric
Following the announcement that our new store in Easton will be run 100% on renewables, we have now made the decision to change our engineering fleet to electric in order to be as sustainable as possible.
Our new electric engineering fleet will help us combat diesel emissions and, while only a small change will take us another small step towards our emissions targets.
Our aim is to reduce our carbon and nitrogen dioxide emissions and, in many other small ways, change and adapt our business to combat climate change and help reach the country’s goal of transitioning to a net zero energy system by 2050, in part, by phasing out diesel vans by 2030.
The engineering fleet is primarily used by our internal engineering team, allowing them to travel between our facilities located in Chesterfield, Scunthorpe, Warrington, and soon Easton.
If you’re interested in any of our services, or to find out more about what we could offer you, call 01246 854999 or visit www.magnavale.co.uk/contact/
More News & Articles
International Day of Awareness of Food Loss & Waste 2022
News & ArticlesInternational Day of Awareness of Food Loss & Waste 2022 In 2019 the U.N General Assembly established the day of...
Plant-Based Proteins: 2021 Vs 2022
News & ArticlesPlant-Based Proteins: 2021 Vs 2022 In 2021, after extensive consultations with our partners, we decided to become the...
Blast Freezing Case Study
News & ArticlesBlast Freezing Case Study Blast freezing, also known as, shock freezing or flash freezing, is a method used to rapidly...
Contact Us
Head Office:
Magnavale Ltd, Park Road,
Holmewood Industrial Park,
Chesterfield, S42 5UY


