News & Articles
Magnavales Engineering Team Switches to Electric
Following the announcement that our new store in Easton will be run 100% on renewables, we have now made the decision to change our engineering fleet to electric in order to be as sustainable as possible.
Our new electric engineering fleet will help us combat diesel emissions and, while only a small change will take us another small step towards our emissions targets.
Our aim is to reduce our carbon and nitrogen dioxide emissions and, in many other small ways, change and adapt our business to combat climate change and help reach the country’s goal of transitioning to a net zero energy system by 2050, in part, by phasing out diesel vans by 2030.
The engineering fleet is primarily used by our internal engineering team, allowing them to travel between our facilities located in Chesterfield, Scunthorpe, Warrington, and soon Easton.
If you’re interested in any of our services, or to find out more about what we could offer you, call 01246 854999 or visit www.magnavale.co.uk/contact/
More News & Articles
Magnavale Bristol Breaks Ground
Magnavale Bristol Breaks Ground Magnavale is pleased to announce that construction has officially commenced on Magnavale Bristol, a...
Chilled Pallet Storage UK Food Retailers & Manufacturers.
Chilled Pallet Storage for Food Retailers and Manufacturers across the UK. Magnavale operates state-of-the-art food storage facilities...
Rapid Air Up-Tempering
In the food industry, maintaining product quality while efficiently managing temperature transitions is crucial. Rapid Air Up-Tempering is...
Contact Us
Head Office:
Magnavale Ltd, Park Road,
Holmewood Industrial Park,
Chesterfield, S42 5UY